Case Study: High-end Energy Neutral Homes

October 22, 2025

The US Builders Review featured us in one of their case studies, giving you a first look at what you can expect with you build with Natale. See why we’re one of the best of the best with our mission to build you a sustainable green home that will last.

US Builders Review: Natale Builders High-end houses with everlasting energy efficiency

Have you heard of energy neutral homes? See how we’re on the cutting edge of green technology. Hear from Director of Sales Peter Kress and how Natale will be with you every step of the way for your new build.

The US Builders Review is a business-to-business trade journal striving to build strong connections within the many sectors of the U.S. construction industry – their case studies highlight businesses’ accomplishments.

Read More

Do I Need a Survey? And What Is Percolation Testing? 

Not sure if you need a survey or percolation testing before you build? This quick guide breaks down what each one does, why it matters for permits and septic planning, and how Natale Builders helps you handle the steps with confidence.

Septic vs. Sewer for a New Build 

Choosing between septic and sewer for your new build comes down to what’s available in your area, your upfront budget, and your site’s soil conditions. Sewer is the most hands-off option with monthly utility fees, while septic typically costs more to install and maintain but can save you from ongoing sewer bills if your lot meets the land and drainage requirements.

WNY Seed-Starting Timeline: What to Start Indoors in Late January and February 

Western New York gardeners can get ahead by building a seed-starting schedule based on the average last frost date, then counting backward to time indoor starts correctly. This guide covers what to start indoors in late January and February, and what not to start too early to avoid common seed-starting mistakes.